Solutions from various vendors |
|
SKS Infrastructure |
|
Excel |
|
RUR |
|
Rajeshree Enviro Solution |
|
|
|
|
|
|
|
|
|
Description of equipment |
|
INVESSEL COMPOST TUMBLER |
|
OWC 30 |
|
RGGC-M Aerobic Composter |
|
Digester |
Capacity for handling waste – KG/day |
|
30/60kg/day2000ltr50-90flats& 70-90kg/d 100-150fla2000ltr +shr |
|
50-100 kgs/day |
|
15-20 kg (3 Sets) |
|
60 kg/day |
Space needed – sq.ft. |
|
16×4=64sqft /LXWXH 16X4X5 |
|
100-125 sq.ft |
|
300 sq ft |
|
100 |
What is the total weight of the equipment when full to capacity? |
|
400kg &470kg respt |
|
N A |
|
each tumbler can weigh 180kg |
|
3000 |
Does a shed need to be constructed to cover the equipment? (Y/N) |
|
y advised 16 x6 x7 |
|
Y |
|
Y |
|
N |
Capital Expense (one time cost Rs.). |
|
1.10lac & 1.30lac respectively [tumblers , shredder 3hp assembly culture absorbent – 3months |
|
389500 (includes Organic Waste Converter + Single Curing System + Transport + Installation + Taxes) |
|
2,55,000 Rs for 3 Sets*(Transport and Taxes extra) |
|
4,50,000 (includes installation) |
Lead time for delivery of equipment, from order placement. Payment terms? |
|
3weeks dly on wo& 50% adv pymt bal on instalaton |
|
1 M |
|
4-6 weeks from payment of 50% advance, bal on delivery |
|
4 weeks from order placement. |
Approximate lifespan of the product (years) |
|
theorotically 8yrs depends on actual usage handling |
|
10 yrs |
|
10 plus |
|
10 |
Operational Expense (recurring expense Rs. per month) |
|
45-60 Rs. per flat |
|
3750 |
|
1000 Rs + labor costs |
|
500 |
Training requirements (what kind of training is needed for operations) |
|
training given while instalation online guidance as & when needed |
|
Basic operations training imparted by Excel |
|
1 hour to housekeeping and 1 hour to reseidents training module |
|
20 minute training module |
Does vendor provide training? (Y/N) |
|
Y |
|
y |
|
Y |
|
Y |
Manpower needed for operations (number of staff) |
|
2 Respt |
|
1 |
|
1-2 Housekeeping Staff needed |
|
1 |
Can the vendor provide staff if required for operations on a salary basis? (Y/N) |
|
if reqd towards O&M/AMC |
|
N |
|
Y |
|
N |
Output of the process |
|
compost |
|
Rich Quality Compost |
|
Organic Compost |
|
Bio Gas & Liquid Compost |
Time needed for output |
|
initially 8-12 days later regular |
|
10 days |
|
6-8 Weeks + 15 days curing |
|
2 days |
Product Literature (user manual, demo videos etc.) |
|
attached |
|
Include links/ attachments |
|
yes : user manual, videos |
|
Yes |
Existing Clientele |
|
references can be given |
|
List of Clientele is given in Proposal |
|
Ashok Towers |
|
References of individuals can be given |
Can you arrange for a demo of the product? |
|
site visit |
|
Y |
|
Y |
|
Y |
Buyback of compost (Y/N) – |
|
N can be used in green area/garden |
|
N |
|
N |
|
N |
If yes, rate of buyback Rs./ kg |
|
NIL |
|
|
|
N |
|
– |
After sales service details. Please mention if charged extra. |
|
O&M/AMC after expiry of warranty period will inform |
|
1st Yr – FREE WARRANTY |
|
2 complimentary monitoring visits |
|
Phone support available for free. |
Which city are your products available in apart from Mumbai? Any difference in pricing? |
|
Mumbai Pune & dealers |
|
|
|
Mumbai, Thane |
|
Mumbai, Vadodara |
Can you take up entire project – training/ awareness + waste collection + segregation (if required initially) + disposal of dry + composting in society + maintenance on a turnkey basis? |
|
Can support for training /awareness /collection/segregation on O&M basis |
|
N |
|
Y |
|
Yes |